Corstorphine Connections

Construction

Planters and benches Featherhall Crescent

Phase 1

We completed the work for phase 1 in 2023, including planting, seating and creating safer spaces outside local primary schools. 

Other changes include

  • a no entry north bound on Featherhall Avenue at the junction with St John’s Road
  • a bus gate on Manse Road at the junction with St John’s Road (since removed following decision by Committee in October 2024)
  • bollard protection to prevent pavement parking on Kirk Loan
  • pencil bollards to replace existing temporary cones at the junction with Meadow Place Road and Featherhall Crescent.

Phase 2

Work was completed in 2024 to widen pavements and reduce pedestrian crossing distances at key locations below, making walking in the area easier and saferPhoto showing latest work to widen pavements on Corstorphine High Street.

  • Corstorphine High Street
  • Junction of Featherhall Terrace at Featherhall Avenue
  • Junction of Kirk Loan at Saughton Road North
  • Junction of Dovecot Road at Ladywell Avenue
  • Junction of Featherhall Avenue at Ladywell Road
  • Junction of Saughton Road North at Roull Road and Broomfield Crescent

Photo showing latest work on Corstorphine High Street

Road safety audits

We commissioned independent road safety audits of the trial project at the design and construction stages of each of the two phases of the project.

The recommendations of the reporting organisation, that carried out the audit, intended to indicate viable ways of removing or mitigating an identified issue. The project team then determined what design changes should be implemented. You can find a project team response at the end of the report which details the design changes to the project in response to the audit.

Read the road safety audit, stage 3 - phase 2

Read the road safety audit, stage 3 - phase 1

Read the road safety audit, stage 1 and 2 - phase 2